Building energy performance analysis is the process of turning meter data into a judgement on whether one building uses energy well. It adjusts consumption for floor area, weather, building use and occupancy, then compares the result with a baseline or benchmark. Without those adjustments, a lower bill can mean a better building, a milder winter, or an empty floor.
A utility bill is not an analysis. It says what you paid, not whether the building earned it. This guide covers building energy performance analysis for a single building: the data to gather, the measures to use, how to adjust for weather, how to read the patterns, and how to chase an odd one down to a cause. Comparing many sites is a separate task, and facilities management teams get better answers when they keep the two apart.
Begin with at least twelve months of energy data so every season appears once. The IPMVP guidance, maintained by the Efficiency Valuation Organization, asks that a baseline represent a full operating cycle of the facility. Then collect the rest:
Bills for every fuel, plus half-hourly or hourly electricity data if the meter provides it.
Gross floor area, with the measurement basis written down.
Operating schedules and, where available, headcount or access-card counts.
Weather data from the nearest reliable station.
A change log covering refurbishments, new tenants, added equipment and altered hours.
Write the change log first. The most useful sentence in any energy dataset is "In March we added a server room." Facilities management staff usually know these events and rarely record them where analysts can see them. If facility management services are outsourced, make interval data exports and the change log part of the contract, not a favour.
Four measures cover most building energy performance analysis. State the units every time.
Energy use intensity (EUI): annual energy divided by floor area, in kWh/m² per year or kBtu/ft² per year.
Weather adjusted consumption: energy after removing the effect of outdoor temperature, in kWh.
Peak demand: the highest power draw in a period, in kW, which often drives demand charges.
Baseload: the lowest steady power draw, usually found overnight, in kW.
EUI comes in two forms. Site EUI counts energy at the meter. Source EUI adds the losses from generating and delivering that energy, and ENERGY STAR Portfolio Manager reports both. Pick one, label it, and never compare a site figure with a source figure. Add cost per kWh and cost per m² as a separate track, because building energy performance analysis that mixes quantity and price cannot tell a saving from a cheaper tariff.
Cold winters raise heating use without anything being wrong, and this is where building energy performance analysis most often goes astray. Degree days measure how far outdoor temperature falls below, or rises above, a base temperature. Base values differ by region and building. UK practice often uses 15.5°C, while US tools commonly use 65°F.
The method is simple. Plot monthly energy against heating degree days (HDD), fit a straight line, and read two numbers from it. The intercept is weather independent use. The slope is weather sensitivity. In a hypothetical building the fitted line is gas = 18,000 kWh + 95 kWh × HDD. A month with 300 HDD predicts 46,500 kWh. If the meter shows 52,000 kWh, the building ran 5,500 kWh, or about 12 percent, above expectation.
Check the model before trusting it. ASHRAE Guideline 14 uses two statistics, CV(RMSE) and NMBE, and treats monthly models within 15 percent and 5 percent respectively as acceptable. Then account for use. A building that added a late shift will use more energy at any temperature, and facilities management reporting should say so rather than let the gap look like waste.
Interval data shows patterns that monthly bills smooth away. Four are worth learning.
Consumption patterns and first checks
|
Pattern |
What it can indicate |
First check |
|
Seasonal peaks |
Heating or cooling dominates; envelope or plant sizing issues |
Compare against degree days |
|
Persistent baseload |
Equipment running when nobody is there |
Night walk-round, submeters |
|
Out-of-hours use |
Schedules overridden or set too wide |
Schedule against interval profile |
|
Sudden step change |
A new load, failed control or changed setting |
Dates of works and alarms |
Baseload is the quiet number, and in facilities management it is the one most often ignored. It rarely makes anyone complain, because nobody feels it, yet it runs 8,760 hours a year. If a building uses more than a third of its daytime power overnight, someone should ask why.
That one-third figure is a prompt for a question, not a standard. Buildings with data rooms, labs or 24 hour operations, which facilities management should treat as special cases, will sit higher for good reasons.
A single building has three honest comparators. Its own history is the strongest, since it shares the same walls and tenants. Peer benchmarks come next, such as CIBSE TM46 in the UK or the ENERGY STAR score in the US and Canada. Design targets, from the original energy model, come last, and they are often optimistic.
Before using a peer benchmark, check four things: the building category fits its real use, the year matches, the area basis matches, and the fuels are counted the same way. An office with an on-site data room is not a general office.
Facility and management teams like a clean benchmark result because it ends an argument. Do not let it end this one. A building can beat its peer figure and still climb four percent a year. Ask facility management companies that quote benchmark compliance which benchmark they used, for which year, and on what floor area.
Here is a hypothetical case: an 8,000 m² office whose electricity bill rose in spring while occupancy stayed flat. The half-hourly data tells the story, and this is building energy performance analysis at its most practical.
Hypothetical electricity profile, average demand
|
Period |
Weekday daytime (kW) |
Night and weekend (kW) |
|
January to February |
150 |
45 |
|
March to April |
152 |
70 |
Daytime use barely moved. Night use jumped 25 kW. Left running all year, 25 kW across 8,760 hours is 219,000 kWh. At an assumed price of 0.20 per kWh, that is about 43,800 a year. The assumption is illustrative, and the real figure depends on how long the load actually runs.
The step happened in early March. A facilities management team holding a good change log can often close a case like this in an afternoon. Here is how to work from that clue:
Match the date against the change log. Was anything installed, serviced or reprogrammed?
Overlay one weekday night before and after the change to see whether the extra load is flat or cycling.
Open the building controls and check schedules and manual overrides.
Walk the building at 11 pm with someone who can read a clamp meter.
Correct the cause, then hand equipment-level diagnosis to fault detection and diagnostics if the culprit is plant.
In building energy performance analysis the likely suspects are air handling units overridden to run overnight, a new always-on load, or a control that failed open. Submeters make the search faster, since one meter on the air handling plant would have split the 25 kW at once. The data narrows the search. It does not name the culprit, and a facilities management service should resist writing "fixed" until a night reading proves it.
Do not compare this April with last April and call the difference savings. Weather, hours and occupancy will have moved. Run the same weather-adjusted model on the pre-improvement period, project it forward, and compare the projection with measured use.
Verification has limits. If the model error is plus or minus 6 percent, a claimed 3 percent saving cannot be confirmed from that model alone. Say so in the report. IPMVP offers options for isolating a single measure with its own sub-meter when whole-building data is too noisy.
Facilities management teams should keep watching for a year. Savings fade when schedules drift back or overrides return. A good building energy performance analysis does not end at the repair, it checks whether the repair lasted.
Why can energy costs rise when consumption falls?
Cost depends on price as well as volume, which facilities management budgets often forget. Tariff increases, higher standing or demand charges, a shift of use into peak periods, or a change in fuel mix can all raise the bill while kWh drop. Analyse kWh and cost separately.
Can different building types use the same benchmark?
No. In building energy performance analysis, hours, equipment and fuel mix differ too much. A hospital, a school and a warehouse need their own benchmark categories, and even two offices differ if one hosts a data room.
How much historical data is useful for an energy baseline?
Twelve months is the practical minimum because it covers one full seasonal cycle. Two to three years helps separate weather effects from real trends. Data from before a major refurbishment or change of use is usually less relevant.
EVO, International Performance Measurement and Verification Protocol (IPMVP): evo-world.org
ASHRAE Guideline 14, Measurement of Energy, Demand, and Water Savings: ashrae.org
US EPA, ENERGY STAR Portfolio Manager, site and source energy: energystar.gov/buildings
CIBSE TM46, Energy Benchmarks: cibse.org